info
Instead of handling and cutting long I Joists, just lay them where they need to go, snap a line 1/8" bigger than your rim material and cut them in place. These were handled 1 time off the forklift into position. Floor system is Roseburg I Joist 24" oc and LVL rim. Stay tuned, we'll be balloon framing all our 2 story walls. . #efficiency #framing #diablofreudambassador #framersareadyingbreed #tipsandtricks @Makita Tools USA @Diablo Tools @Nicks Handmade Boots
Duration: 37 sPosted : Tue, 09 Apr 2024 18:44:15Views
36.3KDaily-
Likes
823Daily-
Comments
18Daily-
Shares
14Daily-
ER
2.36%Daily-
Latest